Description: <div style="text-align:Left;"><div><div><p><span>This layer displays Telephone Gap IRP engineering proposed actions that are point features. Data has been updated since scoping.</span></p></div></div></div>
Description: <div style="text-align:Left;"><div><div><p><span>This data represents the footprint of existing roads (Hadley Lane and Rockwell Access Road) that access the South Pond hut site within the Telephone Gap IRP on the GMNF. The project proposes these roads be added to the NFS system and would be improved to standard within the existing footprint.</span></p></div></div></div>
Description: <div style="text-align:Left;"><div><div><p><span>Area for maple tapping proposed for scoping as part of Telephone Gap IRP.</span></p></div></div></div>