Description: Phase 1 and Phase 2 Certification Units 1 to 100. Updated in November 2012 to account for SEDC-related expansion areas and shoreline adjustments (thru Reach 6). Exclusion areas approved as part of the Phase 2 IDR were also removed (CUs 71, 75, and 99). CUs 61-63, 65-67, 73, 74, 80, 82, 83, 91, 95, and 98 were revised in January 2013 based on 2008 Data Gap sampling results. Tiny slivers along the shoreline were identified by ARCADIS and cleaned up in late-January 2013. Adjustments along the shoreline were applied in March and April 2013 for Reaches 1 through 5 based on shoreline survey data collected by CLE in 2012. A small portion of CU-99 was expanded in May 2013 to capture 2 push cores collected in 2012. The shoreline of CU-60-west was adjusted in August 2013 based on a VDS survey of the 119' extent (received revised line from Parsons as a dwg). The shoreline of CUs 91-1, 95-1, and 96-4 were revised in October 2013 based on shoreline survey information collected during the summer of 2013. CU61-3 was also revised in October 2013 based on bathymetric information to the east; this area was trimmed back to avoid dredging within a significantly deep hole which would not have been supported by design core information.
Copyright Text: Revised by Anchor QEA, LLC, transferred to ARCADIS & Parsons on 10/8/13, as an update to the version dated 8/12/13.