ArcGIS REST Services Directory
JSON

Layer: PUBLISH_PRMD_ENG_WS_HYD_GRND_WTR (ID:0)

View In:   Map Viewer

Name: PUBLISH_PRMD_ENG_WS_HYD_GRND_WTR

Display Field: GWA

Type: Feature Layer

Geometry Type: esriGeometryPolygon

Description: The Groundwater Availability Areas (GWA) dataset represents four zones that identify water yield, natural recharge and/or major/marginal groundwater basins within the County of Sonoma. Interpretation of Water Availability Map: The Groundwater Availability project developed by Permit Sonoma GIS from the official source is the tool used by PRMD staff for site specific analysis of development proposals. The following rules will be used by PRMD Staff in interpreting the map: 1) If a parcel is on a boundary between water availability areas PRMD staff will consider the parcel to be in the most restrictive water availability area. PRMD staff may consider the exact location of the proposed well in making their determination when strong evidence is presented that the well draws from a major groundwater basin or major recharge area. 2) In addition they may require special studies to verify water availability. 3) In cases where the proposed location of the water source is not on the same parcel as the building permit and/or is on property not owned by the applicant, the applicant must submit verification that water availability at the well site is sufficient for the project and that they have permanent control of or access to the water source. Appeals: An applicant may appeal the water availability determination of PRMD staff by submitting a Letter of Water Availability Appeal accompanied by proof that their water situation is different than shown on the map. That proof may consists of report or other data from a licensed professional utilizing data regarding geology, soils, well logs or other authoritative studies. These proposed amendments will follow the same process used for internal amendment proposals and if approved a LOMA will be processed. Amending the Map:As new or more detailed water availability data becomes available PRMD may amend the Official Water Availability Map. Amendments to the map may be initiated internally by PRMD staff due to new data being available form authoritative sources or by applicants in connection with specific projects. PRMD technical staff will evaluate map amendment proposals and if warranted generate an official Letter of Map Amendment. The LOMA will be approved by the Deputy Director for Planning and Engineering and transmitted to GIS staff. Assigned staff will update the official map and log the change into the Map Change Log.Related Resource:Groundwater Availability Areas MapActiveMap Viewer Collection - Map Gallery

Copyright Text:

Min. Scale: 0

Max. Scale: 0

Default Visibility: true

Max Record Count: 1000

Supported query Formats: JSON, geoJSON, PBF

Use Standardized Queries: True

Extent:

Drawing Info:

HasZ: false

HasM: false

Has Attachments: false

Has Geometry Properties: true

HTML Popup Type: esriServerHTMLPopupTypeAsHTMLText

Object ID Field: OBJECTID

Unique ID Field:

Global ID Field:

Type ID Field: GWA

Fields:
Types:

Is Data Versioned: false

Has Contingent Values: false

Supports Rollback On Failure Parameter: true

Last Edit Date: 10/31/2024 9:57:07 PM

Schema Last Edit Date: 10/31/2024 9:57:07 PM

Data Last Edit Date: 10/31/2024 9:56:22 PM

Supported Operations:   Query   Query Top Features   Query Analytic   Query Bins   Generate Renderer   Validate SQL   Get Estimates   ConvertFormat