ArcGIS REST Services Directory
JSON

Transportation_Master_Plan_Greenway_Facilities (FeatureServer)

View In:   Map Viewer

Service Description: Feature class created by HDR Engineering, Inc as part of the City of San Marcos, Texas Transportation Master Plan project 2015-2018. Alignment of existing greenways derived from City of San Marcos Park Trails (2015). Final GIS related files delivered 1/14/2019.

Service ItemId: a84e8fbadaa647ee96118c2aae4e8e04

Has Versioned Data: false

Max Record Count: 2000

Supported query Formats: JSON

Supports applyEdits with GlobalIds: True

Supports Shared Templates: True

All Layers and Tables

Layers:

Description:

Type

Field Description

Field Value

Description

Object ID

ObjectID

Geometry

Type of shape used

Text

Type of the Greenway/Trail

Enhanced Facility Greenway

Greenway/Trail is enhanced

Proposed Facility Greenway

Greenway/Trail is proposed

Text

Classification of Greenway/Trail

UNDEVELOPED

A majority of the land along the Greenway/Trail has no built structures

NEEDS IMPROVEMENT

An existing path which should be upgraded as part of the Greenway/Trail

PEDESTRIAN CROSSING

A segment of the Greenway/Trail is crossing a roadway, water feature, or requires a grade separated crossing

NATURAL

Greenway/Trail exists of an unpaved nature

BUILT

A path of desired material and size currently exists

UNKNOWN

Further information is needed

Text

Ownership of the land the Greenway/Trail

PUBLIC/EXISTING EASEMENT

Majority of the Greenway/Trail is on public land or an existing easement

ROW

Majority of the Greenway/Trail is along an existing or proposed ROW

TEXAS STATE U

Majority of the Greenway/Trail is on Texas State University land

UNKNOWN

Further information is needed

PRIVATE

Majority of the Greenway/Trail is on private property

Double

Length in miles, as calculated in GIS

Long Integer

Length in feet, as calculated in GIS

Text

Proposed Grade Separated Crossing along Greenway/Trail

Yes

Grade-separated pedestrian crossing along Greenway/Trail

No

No grade-separated pedestrian crossings along Greenway/Trail

N/A

Not Applicable; new grade-separation not recommended along Existing Trails

Long Integer

Unique Project Number for Proposed Greenway/Trail projects starting at 1. (All Project_No that are 0 are existing facilities)

Text

Minimum Width of Greenway/Trail Project (feet)

Text

Surface Material used

CONCRETE

Concrete in areas of higher use and flood-prone areas

LIMESTONE

Limestone in areas of less use where a natural path is desired

N/A

Existing Path, Materials only specified for Proposed paths

Text

Name of Street/Land the Greenway/Trail runs along

Text

Starting Limit of the Greenway/Trail

Text

Ending Limit of the Greenway/Trail

Text

At-Grade Pedestrian Crossings along Greenway/Trail

Yes

At-grade pedestrian crossing along Greenway/Trail

None

No at-grade pedestrian crossings along Greenway/Trail

Text

Prioritization

SHORT

0-10 Years

MEDIUM

10-20 Years

LONG

20+ Years

PDD

Proposed Short-Term Greenway on Planned Development or Subdivision

Text

Length of segment (Feet)



Copyright Text: HDR Engineering, City of San Marcos

Spatial Reference: 102740 (2278)

Initial Extent:
Full Extent:
Units: esriFeet

Child Resources:   Info   SharedTemplates

Supported Operations:   Query   ConvertFormat   Get Estimates   Create Replica