ArcGIS REST Services Directory
JSON

NDGISHUB_State_and_Federal_Roads (FeatureServer)

View In:   Map Viewer

Service Description: Includes Interstate, US Highway, and the North Dakota highway system. This information was collected with GPS equipment using the centerline of the highway.

Service ItemId: f49300f0142e44ca8bd17303a92dbbdb

Has Versioned Data: false

Max Record Count: 2000

Supported query Formats: JSON

Supports applyEdits with GlobalIds: False

Supports Shared Templates: True

All Layers and Tables

Layers:

Description:

11/22/2024 – The 4 lanes of US 85 from south of the Little Missouri to south of Watford City was added, US 2 was realigned near RP 313, about 2 miles east of Petersburg. There have also been numerous intersections and ramps "trued up" for preparation of MIRE intersections.

1/27/2022 – Business 94 at Dickinson Interchange 64 – The NE & SE ramps were realigned due to 2021 construction. The 2 ramps and 94B were adjusted to a single intersection. Hwy 20 between reference points 87 and 90 was realigned due to a grade raise several years ago.

3/1/21 - Realigned the following highways: Hwy 1804 - Mileposts 300–301, 303–305, and 317-317.979, Hwy 85 - Mileposts 123-130, Hwy 23A – Milepost 911 and Hwy 35 - Mileposts 0–1

2/3/2020 – Minot Bypass - Added the southbound route to Hwy 83B (Route ID = 10). This includes realignment of the south bound ramp at reference point 921.5. Also realigned two ramps at the I94 and University Drive interchange in Fargo.

12/4/19 - NewTown Bypass – 1.3714 miles was added to Route ID 297. A new reference point was created at the intersection of Route ID 297 and Route ID 205 (Hwy 23) at 48.684 and at 925.629 (Hwy 23B). Reference points were also created at 926 and 927 on Route ID 297 (Hwy23B). The ramps at the Sheyenne Interchange in West Fargo were updated. The Route ID = 169. The 5 existing ramps were realigned and 3 other ramps were created.

9/13/18 - Route ID 4/253 - US 2 Business in Williston, alignment change as it intersects US 2. Route ID 67 - 32nd Avenue interchange on I-29, addition of exit ramp for I-29 Southbound traffic. Route ID 205 - alignment change at the intersection of ND 23 and County Roads 55 and 10

3/21/17 - Route ID 68 Interchange 64.252 on I-29 in Fargo. This interchange is 13th Avenue and I-29 one leg of the ramp was realigned.

1/25/17 - started to maintain roads in Esri's Road and Highways. The shapes now contain measures in miles along with the associated linear referencing/roads and highways fields. Changes also include adding ramps and mainline designations in RTE_SUFFIX field.

9/22/16 - added Killdeer Bypass 1. ND 22 North Route ID = 272, Created a new alignment for ND 22 west of Killdeer that begins with intersection of ND 200 and travels northeasterly to a junction with ND 22B north of Killdeer. New reference points were created on the new alignment as follows: 105.710 intersection of ND 22 and ND 200, 106, 107, 108, 109, 109.518 intersection of ND 22 and ND 22B north of Killdeer.2. ND 22 Business (Killdeer) Route ID = 302, The existing ND 22 through Killdeer becomes ND 22 Business due to the completion of a bypass route constructed west of Killdeer. New reference points were created as follows: 940.466 this junction of ND 22, ND 200 and ND 22B. Current ND 22 reference points through Killdeer remain in place but the number changes as follows: 105.000 = 941.000, 106.000 = 942.000, 107.000 = 943.000, 108.000 = 944.000, 109.000 = 945.000. Reference point 945.518 intersection of ND 22B and ND 22 north of Killdeer was also created.3. ND 200 East Route ID = 200, A new reference point 93.247 was created for the intersection of ND 22 and ND 200 west of Killdeer.

9/6/16 by bb - added Dickinson Bypass and associated Reference Points.

3/1/16 by bb - realigned US 85 North Route ID = 261 to match 2015 NAIP. Added Ramps on 94 at Mile Marker 56.668.

10/20/2015 by bb - 1. US 85 North Route ID = 261, Created new alignment for US 85 North that follows the permanent NW Bypass at Williston. New reference points were created as follows: 184, 185, 186, 187, 188, 189, 190, 191, 192, 193, 194, 195, 196, 196.705 this is the junction of US 85 and US 2 north of Williston.2. US 85 South Route ID = 300, Created new alignment for US 85 South that completes the four lane project between Alexander and Williston. New reference points were created as follows: 173, 174, 175, 176, 177, 178, 179, 180, 181, 182, 183, and 183.743. This is the junction with the US 2 west of Williston. Created new alignment for US 85 that follows the permanent NW Bypass at Williston. New Reference points created as follows: 184, 185, 186, 187, 188, 189, 190, 191, 192, 193, 194, 195, 196, 196.705 this is the junction of US 85 and US 2 north of Williston.3.US 2 East Route ID = 253, alignment change north of Williston at junction of US 85, also created new reference point 25.674 at the intersection of US 85 on north end of NW Permanent Bypass.4. US 2 West Route ID = 254, alignment change north of Williston at junction of US 85, also created new reference point 25.674 at the intersection of US 85 on north end of NW Permanent Bypass.5. ND 3 Route ID = 263, Realignment and grade raise south of Junction of ND 200 west of Hurdsfield has been corrected.

5/14/15 by bb - US 281 slip ramp at Church’s Ferry has been removed during a reconstruction project. This segment of roadway was designated as Route ID 25, Interchange ID 175.379, reference points 3.000 and 4.500.

2/6/15 by bb - An extension of ND 46 has been added to the State Highway system. The segment of roadway east of I-29 was removed from the State Highway system in 1977. As of May 2011, a document showing a maintenance agreement with a county, as required by State Law to transfer responsibility, has not been found. The Fargo District has been doing basic maintenance on this segment. The segment of road that begins at I-29 and extends to the east until the intersection CMC 0957 is added to the State Highway system. The addition will result in an increase of 0.4 miles. This addition has also created a new reference point 120.823 which is at the end of the highway, reference point 120.318 is moved to the center of the structure on I-29.

11/18/14 by bb - added New Town Bypass

11/3/14 by Gerald - extended US85 Southbound to Mile Marker 172

US 85 South Route ID = 300, Created new alignment for US 85 South that follows the Watford City SW Bypass and the West Bypass at Alexander as well as the new alignment for the 4-lane project that continues to reference point 172.000 which is north of McKenzie County Highway 16. New reference points were created as follows: 139.082 beginning of highway south of Watford City, 140.831 junction with the US 85 Business in Watford City, 145.659 junction of US Business west of Watford City, 160.505 junction with US 85 Business south of Alexander, 163.506 junction of US 85 north of Alexander. Created all whole number reference points between 139.082 and reference point 172.000.

10/29/14 by Gerald

1. ND 23 Business Route ID = 297, Changed existing ND 23 in Watford City from the previous Junction of US 85 to the Junction of ND 1806 to ND 23B also changed the reference points 0.000 = 900.000, 1.000 = 901.000, 1.350 = 901.350, 2.000 = 902.000, 3.000 = 903.000, 3.353 = 903.353

2. ND 23 East Route ID = 205, Watford City SE Bypass from the previous Junction of US 85 continuing northeasterly to the current alignment of ND 23. New reference point 0.533 was created for the beginning of the route as well as reference point 3.701 which is the Junction with ND 1806 extension.

3. ND 23 West Route ID = 299, Watford City SE Bypass from the previous Junction of US 85 continuing northeasterly to the current alignment of ND 23. New reference point 0.533 was created for the beginning of the route as well as reference point 3.751 which is the termination point of this route.

4. ND 1806 Route ID = 271, Created an extension of ND 1806 from the Junction of ND 23 B north of Watford City to the Junction of the ND 23 along the new alignment. New reference point 311.577 was created for the intersection.

5. US 85 North Route ID = 261, Created new alignment for US 85 North that follows the Watford City SW Bypass and the West Bypass at Alexander as well as the new alignment for the 4-lane project that continues to the Junction of US 2 at Williston. New reference points were created as follows: 140.831 junction with the US 85 Business in Watford City, 145.659 junction of US Business west of Watford City, 160.505 junction with US 85 Business south of Alexander, 163.506 junction of US 85 north of Alexander.

6. US 85 South Route ID = 300, Created new alignment for US 85 South that follows the Watford City SW Bypass and the West Bypass at Alexander as well as the new alignment for the 4-lane project that continues to the Junction of ND 200 North of Alexander. New reference points were created as follows: 140.831 junction with the US 85 Business in Watford City, 145.659 junction of US Business west of Watford City, 160.505 junction with US 85 Business south of Alexander, 163.506 junction of US 85 north of Alexander. Created a new reference point 139.082 which is the beginning point for US 85 South along with all reference points between this point and the Junction of ND 200 North of Alexander.

7. US 85 Business North Route ID = 298, The existing route US 85 through Watford City and Alexander becomes US 85 Business due to the completion of the Bypass routes. New reference points that were created are: 950.000 intersection with US 85, 950.555 intersection with ND 23, 951.000, 952.000, 952.486 intersection with ND 23 A, 952.707 intersection with ND 23 B, 953.000, 954.000, 955.000, 956.000, 956.233 intersection with US 85 west of Watford City, 970.079 intersection with US 85 south of Alexander, 971.000, 972.000, 973.000 intersection with US 85 north of Alexander.

8. Several small alignment changes occurred due to construction projects: ND 8 Junction ND 50 to Bowbells. ND 22 slide repair through the badlands. ND 57 and ND 20 South of Devils Lake. ND 31 bridge replacement 13 miles north of South Dakota Border. ND 23A in Watford City, this highway had the wrong designation as ND 23B, this change corrected this error and is now correctly designated as ND 23A.

9. Junction of ND 1804 and ND 58 near Trenton, the intersection of these two highways was realigned.

10. US 2 alignment in Williston near 11th street to near 9th Ave NW.

Changed all RTE_SIN codes to either I, U, or S.

2/15/13 - changes made by Gerald

ND 23 - West of Four Bears Bridge between reference points 44 and 45. Horizontal curve was removed.

ND 8 - North of Junction with ND 23 Horizontal curves between reference points 135 and 136, also between 150 and 151 have been re-aligned.

ND 28 - Junction with US 2 at Berthold has been re-aligned and intersection was moved to the east.

ND 34 and ND 30 - Slip ramp at this junction has been removed.

ND 48 - Junction with US 83 at Coleharbor has been re-aligned.

ND 22 - North of Dickinson, south bound lane has been extended to north of Stark county line.

ND 22 - North bound moved to the east and is on a new alignment.

ND 1804 - Road alignment correction has been made near reference point 295.

ND 10 - Road alignment correction has been made West of Casselton.

9/28/11 - changes made by Gerald - Route Changes 2011

Bismarck – Business 94 E & W remove segment from east side of Memorial Bridge to the intersection of Bismarck Expressway. The NDDOT and city of Bismarck entered into an agreement to transfer ownership and maintenance responsibility to the city of Bismarck. This is referenced in State Highway Change order 2000-01

The following reference points have been removed:Eastbound (route id 266) 922, 922.724, 922.860, 923, 924, 925Westbound route id 267) 922, 922.724, 922.860, 923, 924, 924.140The following reference points have been added:Eastbound (route id 266) 921.096Westbound (route id 267) 921.096

Jamestown – Business 94 E & W are removed from the state highway system. This change was agreed upon by the city of Jamestown and the NDDOT after these areas where reclassified to the urban roads system.The following reference points have been removed:Eastbound (route id 266) 926.868, 927, 928, 928.127Westbound (route id 267) 926.868, 927, 927.190

Jamestown – US 281 N & S are removed from the intersection of US 281 and I-94 to the intersection with US 52 due to the construction of the US 52 Bypass. These segments are now identified as US 52 E & W.The following reference points have been removed:North bound (route id 255) 67.929, 68.630 (need to remove 68 from dt292010)South bound (route id 256) 67.929, 68.630 (need to remove 68 from dt292010)

Jamestown – US 52 E & W alignments have changed the portion of this route that traveled east from the junction with US 281 in the center of the city to I-94 east interchange has been removed. The route now runs along the route that used to be US 281 south to the Junction of I-94 and US 281.

The following reference points have been removed:Eastbound 266.305, 268.000, 268.114 (route id 257) (rpt 267 has been moved to new alignment)Westbound 266.305, 267.222 (route id 258) (rpt 267 has been moved to new alignment)The following reference points have been added:Eastbound (route id 257) 267.632Westbound (route id 258) 267.632

Drayton – Realigned ND 66 due to bridge replacement (route id 242).Hannover – Removed slip ramp at the intersection of ND 31 and ND 25 (route id 24).Scranton – Removed the west leg of ramp at jct of US 12 and ND 67 (route id 289).Scranton – Realigned ND 67 due to bridge replacement (route id 243).Bismarck – Changed the ramps at the junction of I-194 and Business 94 (route id 186).Fargo – Added a new entrance ramp to the interchange at 45th street (route id 170).

9/16/10 - added fields to aid in creating roads_state_mm RTE_SUFFIX, HWY_CHAR, HWY_DIR, HWY_SUFFIX, HWY_SUFFIX_DIR removed fields that are no longer needed F_MEAS, T_MEAS, P_STREET_NAME

5/11/10 updated by bb updated f_mile and to_mile on line segments that touch ref pt 1.564 on hwy 294

4/1/10 updated from j: drive by bb 9th street interchange on I-94 in West Fargo was completed. Corrected an error on ND 810, the McKenzie Interchange reference points were not increasing correctly. 52nd avenue interchange in Fargo was rebuilt, this is the begin of Business 81. 12th avenue interchange was modified to accommodate the four lane portion of ND 294 in Fargo. Business 81 (52nd avenue and parts of University avenue) was completed as a four lane highway. ND 294 (12th avenue) was completed as a four lane highway. ND 1804 south of Bismarck had some alignment changes. US 281 in Belcourt was added as four lane segment.

4/1/10 - 9th street interchange on I-94 in West Fargo was completed. Corrected an error on ND 810, the McKenzie Interchange reference points were not increasing correctly. 52nd avenue interchange in Fargo was rebuilt, this is the begin of Business 81. 12th avenue interchange was modified to accommodate the four lane portion of ND 294 in Fargo. Business 81 (52nd avenue and parts of University avenue) was completed as a four lane highway. ND 294 (12th avenue) was completed as a four lane highway. ND 1804 south of Bismarck had some alignment changes. US 281 in Belcourt was added as four lane segment.

10/10/08 - Added missing year 2000 alignment change on US 83 northbound near painted woods creek south of Washburn. 9/29/08 - The remaining 30 miles (mp 99-131) of new US 2 road centerline and reference points were added. This completes the 4-lane project of US 2 from Williston east to Minnesota. Added missing interchange legs on I29 -12th and 19th avenues in Fargo. Added missing year 2000 alignment change on US 83 northbound near painted woods creek south of Washburn.

3/27/08 - Fixed extra vertex on I29 north of Fargo

2/28/08 - Fixed Hwy Number for Ramps.

1/16/08 - New alignment for north and southbound 1804 south of Bismarck to south of University of Mary. New 4 lane section of US 2 from jct us 85 north of Williston to Ray.

2/13/07 - combined State Roads and Ramps into one layer.

12/15/06 - Addition of US 2 Westbound lanes from Ray to Palermo. New alignment of US 2 Eastbound from Ray to Palermo.

10/30/06 - Changed alignment of US 281 and ND 19 to match new construction. The old roads are now under county ownership. US 281 MP 155 to MP 175 moved 1.5 miles west of old location. ND 19 shortened west of Minnewauken and lengthened west of Devils Lake.

3/16/06 - ND 1804 - Bismarck 12th Street to Bismarck Expressway. Addition of southbound lane. ND 32 & ND 11 in Forman - Realignment of Intersection. Business Loop ND 13 - Wahpeton Realignment of Intersection. US 281 & ND 57 - Realignment of Intersection. ND 23 - New Town - Four Bears Bridge Realignment ND 200 & ND 8 - Halliday - Realignment of Intersection Added south bound lanes on a portion of Business US 2 in Williston, This was missed in the original collection of the data in 1993.

5/16/05 - Updated I94 Business Loop - East and West, Hwy 810, Hwy10 This data came from the NDDOT's Planning Section. It was converted from a projection (NAD 1983 UTM Zone 14N) to a Geographic coordinate system.



Copyright Text:

Spatial Reference: 102100 (3857)

Initial Extent:
Full Extent:
Units: esriMeters

Child Resources:   Info   SharedTemplates

Supported Operations:   Query   ConvertFormat   Get Estimates   Create Replica