(07-03-2024) UPDC Midyear update showing South Campus Construction including new dormitory, walkways, access drives, and changes from enabling infrastructure project.
(12-19-2023) UPDC Minor Updates include Surface Improvements at CUP Service Drive.and Tasker Minor clean-up of Data
(12-20-2022) Temporary Sidewalk along Mansfield Road at Mirror Lake added due to South Campus Residence Hall change in Logistics.causing a change in lawn area.
(12-01-2022) UPDC Lawn areas were added at former temporary construction sites including Northwest Science Quad and SUP and Hockey. Lawn was removed at new Temporary Construction Site at South Campus residence Hall. Attribute Table was simplified to reflect that all lawns are mainted by Contractor (EA Quinn) and those still under guaranty were noted with Guarantee end date and landscape contractor identified
(10-12-2022) UPDC Lawns was updated from a shapefile in Department Request and is now included in the Basemapping.gdb under Landscapes. It is one of four features that represent softscape cover on UConn’s Storrs and Depot campuses.