ArcGIS REST Services Directory
JSON

All_Aerial_Screen (FeatureServer)

View In:   Map Viewer

Service Description: This layer shows the sidewalks at the UConn Storrs main and Depot campuses. Sidewalk Screening is used to hide changes not captured in the most recent aerial used only for improving the readability of maps.

Service ItemId: d5a3606ccc6741628273cb552eea1f47

Has Versioned Data: false

Max Record Count: 2000

Supported query Formats: JSON

Supports applyEdits with GlobalIds: False

Supports Shared Templates: True

All Layers and Tables

Layers:

Description:

(07-03-2024) UPDC Midyear update showing South Campus Construction including new dormitory, walkways, access drives, and changes from enabling infrastructure project.

(12-19-2023) UPDC Minor Updates include Surface Improvements at CUP Service Drive and at Tasker. Minor clean-up of Data

(12-20-2022) Temporary Sidewalk along Mansfield Road at Mirror Lake added and Academic Way removed due to South Campus Residence Hall change in Logistics.

(12-01-2022) UPDC New sidewalks related to projects reaching substantial completion including Science One, SUP and Hockey. Removal of sidewalks at South Campus Residence Hall now under construction.

(10-11-2022) UPDC added an attribute field to segregate UConn owned walks, new sidewalks near CUP Service Drive were added, corrected areas as part of land cover update, including concrete pads not previously shown at Northwoods and public art on concrete foundation

.(12/28/2021) UPDC Reviewed Crosswalks for accuracy, added Town of Mansfield Bikeway (approximate) to share with SLR Consulting

(11/12/2021) UPDC Update Removed Duplicate Sidewalks. Updated Sidewalks at Athletic District, YZ Lot, Rotary, Lot K. Updated Crosswalks on North Eagleville Road. Updated crosswalk near Klink. Updated Crosswalks near Hicks/Grange. Parking/Sidewalk Updates at Lot K

Update (04/13/2020): Updated the names of roads based from the updated communication map of UConn, which was published in January of 2020.

Update (01/28/20): Updated with 2019 Linework from Eileen McHugh

Update (02/28/2018): Moved the marching band practice field from sport fields to sidewalk.

Update (03/01/2018): Updated the sidewalks around tennis courts and Javelin field.

Update (03/16/2018): Adjusted the planimetric polygons to align better with other transportation layers (driveways, roads, and parking areas) using Transportation_Polygons received from Sanborn.

Update (5/10/2018): Created new sidewalk polygons in Depot Campus based on transportation lines feature class and 2016 aerial photography.

Update (8/07/2019): Added and deleted sidewalks based on CAD drawing provided by Eileen.



Copyright Text:

Spatial Reference: 102656 (2234)

Initial Extent:
Full Extent:
Units: esriFeet

Child Resources:   Info   SharedTemplates

Supported Operations:   Query   ConvertFormat   Get Estimates