Description: The Alternative Fuel Corridors dataset was created in 2016 and was updated on January 16, 2025 with new Round 8 designations from the Federal Highway Administration (FHWA) and is part of the U.S. Department of Transportation (USDOT)/Bureau of Transportation Statistics (BTS) National Transportation Atlas Database (NTAD). The dataset is a highway layer of corridors, primarily along the NHS, that are designated as Corridor Ready or Corridor Pending. It includes designations of five types of alternative fuels, Electric Vehicle Charging (EV), Compressed Natural Gas (CNG), Liquefied Natural Gas (LNG), Propane (LPG), and Hydrogen. Corridor-ready segments currently contain a sufficient number of fueling facilities to allow for corridor travel with the designated alternative fuel, and to qualify for highway signage. Corridors that do not have sufficient alternative fuel facilities to support alternative fuel vehicle travel are designated as corridor pending. A data dictionary, or other source of attribute information, is accessible at https://www.transportation.gov/gis/nad/nad-schema
Copyright Text: Acknowledgment of the Federal Highway Administration (FHWA), State DOTs, Trucker's Friend database, and the Bureau of Transportation Statistics (BTS) [distributor].
{"renderer":{"type":"uniqueValue","field1":"ELECTRICVE","defaultSymbol":{"type":"esriSLS","style":"esriSLSSolid","color":[170,170,170,255],"width":1.5},"defaultLabel":"AFC - Not an EV Corridor","uniqueValueGroups":[{"heading":"","classes":[{"label":"EV Corridor Pending - An insufficient number of EV charging stations currently exist","description":"EV Corridor Pending - An insufficient number of EV charging stations currently exist","symbol":{"type":"esriSLS","style":"esriSLSSolid","color":[162,128,186,255],"width":1.5},"values":[["Signage Pending"]]},{"label":"EV Corridor Ready - A sufficient number of EV charging stations currently exist (minimum 50-mile intervals)","description":"EV Corridor Ready - A sufficient number of EV charging stations currently exist (minimum 50-mile intervals)","symbol":{"type":"esriSLS","style":"esriSLSSolid","color":[89,169,95,255],"width":1.5},"values":[["Signage Ready"]]}]}],"uniqueValueInfos":[{"symbol":{"type":"esriSLS","style":"esriSLSSolid","color":[162,128,186,255],"width":1.5},"value":"Signage Pending","label":"EV Corridor Pending - An insufficient number of EV charging stations currently exist"},{"symbol":{"type":"esriSLS","style":"esriSLSSolid","color":[89,169,95,255],"width":1.5},"value":"Signage Ready","label":"EV Corridor Ready - A sufficient number of EV charging stations currently exist (minimum 50-mile intervals)"}],"fieldDelimiter":",","visualVariables":[{"type":"sizeInfo","valueExpressionTitle":"Custom","valueExpression":"$view.scale","stops":[{"size":4.6667588495575227,"value":144447.638572},{"size":2.3333794247787614,"value":1155581.108577},{"size":1.7500345685840708,"value":9244648.868618},{"size":1.1666897123893807,"value":73957190.948944}],"axis":"height","valueUnit":""}]},"scaleSymbols":true,"transparency":0,"labelingInfo":null}
HasZ: false
HasM: false
Has Attachments: false
Has Geometry Properties: true
HTML Popup Type: esriServerHTMLPopupTypeAsHTMLText